START at PAINT MARK adjoining concrete field entrance in New Road Hemingford Abbots
approximately 112m North of A1307. (W3W //haggling.tools.pockets). Proceed to T junction and take
slip road (left) to join A1307 towards Cambridge. Continue on A1307 to Swavesey North RAB
(5.1miles). Take the first exit (left) and proceed to Bucking Way Road RAB. Circle RAB and retrace to
Swavesey North RAB. Take the third exit (right) taking CARE TO MERGE WITH TRAFFIC FROM THE LEFT
and proceed on A1307 towards Huntingdon. Continue on A1307 to take slip road off to
Godmanchester RAB (12.4 miles). Circle RAB and retrace on A1307 to Swavesey North RAB (19.3
miles) and take the first exit (left) to Bucking Way Road RAB. Circle RAB and retrace to Swavesey North
RAB. Take the third exit (right) taking CARE TO MERGE WITH TRAFFIC FROM THE LEFT and proceed on
A1307 towards Huntingdon to FINISH at white paint mark adjoining drain cover on sliproad under
Rideaway Junction bridge. (25 miles)
